Pricing depends on the number of racks, the power you need and your connectivity. Get in touch and we’ll quote against your exact requirements.
Tell Us What You Need, Get a Tailored Quote
"*" indicates required fields
CGK11 in East Jakarta and CGK10 in West Jakarta are linked by a Metro Connect DWDM ring, so you can run production and backup on one platform, with one provider and one contract.
Uptime Tier IV Colocation for Critical Workloads
On MT Haryono St, between East and South Jakarta. Backed by N+1 generators and built for workloads that can’t go down, with room to grow from your first rack to a private suite.
Uptime Tier III Colocation With Room to Grow
On Daan Mogot Rd, in one of Jakarta’s key commercial hubs. A purpose-built, eco-friendly facility with N+1 generators, and a cost-efficient home for production, backup or disaster recovery, from a single cabinet to a full suite.
Every option includes power, cooling, security and access to 25+ network providers. Tell us your rack count and power, and we’ll quote around it.
Everything You Need, at Both Campuses
Carrier-Neutral Connectivity
Choose from 25+ network providers, with meet-me rooms and diverse fiber entry points. CGK10 and CGK11 are linked by a Metro Connect DWDM ring.
Layered Physical Security
24×7 on-site security, CCTV with 90-day backup, and biometric or photo-badge access at every entry.
Reliable Power
2N UPS redundancy and dual power feeds to every rack, backed by N+1 generators at both campuses.
Hands-On Support, Day and Night
24×7 remote hands, a secure loading bay, a staging area for rack and stack, and a customer lounge for your team.
FAQ
Both campuses offer flexible options starting from a single rack or cabine
Yes. Partners get fast quotes for client proposals and a dedicated contact
No. We provide the space, power, cooling and connectivity for your own equipment.
Our 24×7 remote hands, secure loading bay and staging area support rack and stack. For import procedures, please check with your logistics or legal advisor
Yes. You can rent a single rack, multiple racks, a cage or a private suite at CGK11 or CGK10, with power, cooling and 25+ network providers included.
Yes. As part of Digital Realty’s global platform of 300+ data centers, we support international companies entering Indonesia, with 24×7 remote hands for teams that aren’t on site.